45 containers and break bulk cargo (total weight: 1.642 to / total volume: 10.625 m³)
Logistical organization and handling ex factories in various origins up to DAP construction site (208 km from port of entry). Our main challenge was the on-carriage. Various assembly groups of approx. 50 m lengths and 70 t weight per unit had to be delivered to jobsite in convoys of two. Due to local restrictions, convoys can not be longer than 100 m. Meaning that we had to organize 5 of these convoys together with 20 simultaneous heavy weight transport.
… well done, BLS Chile!